Warning: count(): Parameter must be an array or an object that implements Countable in /home2/adriads/public_html/libraries/cms/application/cms.php on line 460

Warning: count(): Parameter must be an array or an object that implements Countable in /home2/adriads/public_html/components/com_k2/models/item.php on line 881
Monday, 18 July 2022 13:22

Wartsila steps up green fuel push with methanol-powered ship

Written by
Rate this item
(0 votes)

Wärtsilä will deliver the first engine for an offshore wind installation vessel ordered by Dutch contractor Van Oord. Expected to be delivered in 2024, Boreas will be ready to install the largest 25MW offshore windmill. Since there are not enough carbon-neutral fuels on the market, the engines can run on either green methanol produced using renewable resources such as biomass and solar energy, or regular marine fuels.


Warning: count(): Parameter must be an array or an object that implements Countable in /home2/adriads/public_html/components/com_k2/templates/default/item.php on line 248
Read 791 times