Warning: count(): Parameter must be an array or an object that implements Countable in /home2/adriads/public_html/libraries/cms/application/cms.php on line 460

Warning: count(): Parameter must be an array or an object that implements Countable in /home2/adriads/public_html/components/com_k2/models/item.php on line 881
Thursday, 01 December 2022 14:22

Amazon announces 300 MW wind-solar hybrid projects in India

Written by
Rate this item
(0 votes)

Amazon has announced the first wind-solar hybrid project in India with Vibrant Energy, a subsidiary of Macquarie Green Investment Group. The two projects represent 300 megawatts (MW) of renewable energy capacity and will be located in the states of Madhya Pradesh and Karnataka. Amazon owns three solar farms in Rajasthan and currently has five utility-scale renewable energy projects in the country. It aims to use 100% renewable energy worldwide by 2025.


Warning: count(): Parameter must be an array or an object that implements Countable in /home2/adriads/public_html/components/com_k2/templates/default/item.php on line 248
Read 485 times