Warning: count(): Parameter must be an array or an object that implements Countable in /home2/adriads/public_html/libraries/cms/application/cms.php on line 460

Warning: count(): Parameter must be an array or an object that implements Countable in /home2/adriads/public_html/components/com_k2/models/item.php on line 881
Thursday, 30 November 2023 13:00

Sterlite Power wins 8 GW green energy transmission project in Rajasthan

Written by
Rate this item
(0 votes)

Sterlite Power has secured an order for the Rajasthan REZ Ph-IV: Part B transmission project, which will deliver 8 GW of renewable energy to the states of Rajasthan, Haryana and Uttar Pradesh. The project will see around 8,000 MW of renewable energy flow from renewable energy-rich Bikaner to load centers in Rajasthan, Haryana and Uttar Pradesh. Sterlite Power will build the project on a 35-year BOOT basis.


Warning: count(): Parameter must be an array or an object that implements Countable in /home2/adriads/public_html/components/com_k2/templates/default/item.php on line 248
Read 232 times