Warning: count(): Parameter must be an array or an object that implements Countable in /home2/adriads/public_html/libraries/cms/application/cms.php on line 460

Warning: count(): Parameter must be an array or an object that implements Countable in /home2/adriads/public_html/components/com_k2/models/item.php on line 881
Monday, 11 March 2024 15:13

Nexans Completes Cable Pull-Ins at Moray West Offshore Wind Farm

Written by
Rate this item
(0 votes)

French subsea power cable manufacturer Nexans has completed offshore export cable pulling work at the Moray West offshore wind farm in Scotland. The operation was carried out using a Nexans Aurora cable-laying vessel. The project is being developed by Ocean Winds as part of a joint venture between Engie and EDP Renewables. The next step is to energize the first circuit. Amazon will purchase 473 megawatts of clean electricity from wind farms.


Warning: count(): Parameter must be an array or an object that implements Countable in /home2/adriads/public_html/components/com_k2/templates/default/item.php on line 248
Read 136 times