Warning: count(): Parameter must be an array or an object that implements Countable in /home2/adriads/public_html/libraries/cms/application/cms.php on line 460

Warning: count(): Parameter must be an array or an object that implements Countable in /home2/adriads/public_html/components/com_k2/models/item.php on line 881
Monday, 10 July 2023 13:29

Morocco names pre-qualification firms in 400 MW solar project

Written by
Rate this item
(0 votes)

Morocco's renewable energy agency Masen has announced that six consortiums have been prequalified to build a 400 MW solar plant called Noor Midelt II in the Atlas Mountains. The project aims to build a photovoltaic power station with two-hour energy storage capacity. Phase 1 has not been completed due to disagreements over CSP technology. Morocco plans to increase the share of renewable energy to 52% by 2030.


Warning: count(): Parameter must be an array or an object that implements Countable in /home2/adriads/public_html/components/com_k2/templates/default/item.php on line 248
Read 480 times