Warning: count(): Parameter must be an array or an object that implements Countable in /home2/adriads/public_html/libraries/cms/application/cms.php on line 460

Warning: count(): Parameter must be an array or an object that implements Countable in /home2/adriads/public_html/components/com_k2/models/item.php on line 881
Saturday, 15 July 2023 18:08

Suzlon bags 100.8 MW wind energy project from Everrenew Energy

Written by
Rate this item
(0 votes)

Suzlon Group has received an order from Everrenew Energy for a 100.8MW wind power project in Tamil Nadu. The project will install 48 wind turbines and be operational by March 2024. The project can provide electricity to 65,000 households and reduce carbon dioxide emissions by 2.58 tons per year. The project aims to promote the adoption of renewable energy in India by targeting commercial and industrial consumer groups.


Warning: count(): Parameter must be an array or an object that implements Countable in /home2/adriads/public_html/components/com_k2/templates/default/item.php on line 248
Read 511 times